伊人久久精品亚洲午夜_国产美女自慰在线观看_18性欧美XXXⅩ性满足_www插插插无码免费视频网站

 
?
    Online query

    In order to facilitate users to query the authenticity of products as quickly as possible, please pay attention to the official wechat of gbpsc 查(cha)詢

    Brand qualification Current position: Site home- Brand qualification

    No.Parts Names         Q.W.Period   Following Items out of the Rangement of Q.W.Period.

    01    drill rod            36m      ;   1/3length of the drill rod consumed、in&exbush worn  

    02    nitrogen             03m         damage by external impact、  

        valve       ;                     lost due to loose but no tightening timely  

     

     

     

    03   front head           30m          damaged & worn by external impact

    04   back head            14m          damaged & worn ;by external impact/broken by working frequently 

        ;                                 under no-load (excluding in. & ex.bush)

    05  changing        ;     24m          foreign matters in hydraulic oil/injury ;by pulling、

       value                             outlasting the replacing time of oil seal/poor scheduled

                                                                              maintenance、mistakes by users、injury by pulling

    06  machine core                    12m          foreign matters in hydraulic oil、outlasting the replacing time of oil 

      (cylinder )                        seal/misuse or bad quality pipeline leading to piston napping、

               ;                          injury by pulling、mistakes by users、poor scheduled maintenance

    07  piston ring            12m          foreign matters in hydraulic oil/outlasting the replacing time of oil

       & piston                          seal/no choice of parts provided the manufacturer/injury of piston 

                                         by pulling/mistakes by users/bush of breaker fixer consuming 

    08  in.&ex.bush          12m ;         damaged/worn by consuming (crazing in QWP)

    09  track bolt /           03m          loose due to no scheduled maintenance、

     

        through bolt                        damaged /worn by external impact

    10  oil seal             06m          damage by foreign matters in hydraulic oil

                                         damage & worn caused by injury of piston by pulling/

    11  cotter /cup                       03m          wearing heavily leading ;to damage、wear

     

     

         head/spring pin

     

    12  crew/nut             03m          nut losing by an operator no tightening on time

    13  hydr.driving            ;      03m      ;    damage by fracture of oscillating plateby external impact、

     

          hose                                                            by pressure by over-adjustment of relief valve

     

    14  housing                ;              06m          damage by operators no abiding by、crazing caused by 

     

       (including                        strengtheningwithout the manufacturer authorizing 

     

       lining)                          (solving crazing at welds by customers, replacement 

                                        under not available after customers re-welding)

    15  uppercover ;          03m         damage by external impact /misoperation

      (towertype)

    16  energy accumu ;                 12m         damage by external impact /poor scheduled maintenance 

     

         lator(optional)

     

    17  sealing cup(energy            03m         damage by insufficient amount of nitrogen pressure/pressure/over-  

       accumulator)                      adjustment of relief valve causing damage

    18  hose  ;               02m         damage by poor scheduled maintenance/fracture of oscillating plate/

      (pipeline)                          external impact/ pressure by over-adjustment of relief valve

    19  rigid tube                    ;      03m         damage by poor scheduled maintenance/fracture of oscillating plate/

     

      (pipeline)                          external impact/pressure by over-adjustment of relief valve

    20  relief valve                         03m         damage by abnormal temperature rising/pressure by over- 

      (pipeline)                          adjustment of relief valve

    21  foot operated                   03m       ;  damage by wearing/crashing/dismantling

         valve(pipeline)

     

    22  stop valves                        03m         damage by wearing/crashing/dismantling

     

       (pipeline)

                            Claims Reporting Handling:

    1.Concrete matters should be reported to the local distributor.         

    2.Quality policy & inspection certificate should be provided as well as claims reporting.

    3.The company only is responsible for GBPSC hydraulic breaker itself, not downtimework-  

        related injury and other matters related to caused by quality problem.

    4. During the mentioned warranty period, work hours are calculated in accordance with standard 

      hours based on 8hours/day.

    5.The quality warranty has been carried out by virtue of certificate of qualification issued since 

      April 20, 2013,previously the terms still work.

     
    Links
    江蘇工兵機械裝備有限公司受ZFB商標所有人:工兵機械(韓國)有限公司授權使用GBPSC,是一家制造,進口,銷售,維修,服務,信息管理于一體具備現代化經營管理模式的制造型企業.
    產品保修
    防偽查詢
    請關注公眾號
    GBPSC999
    連港工兵
    官方小程序
    15996119999